Activity Network

AOE network
Edge represents task or activity to be performed on a project
Vertex represents event which signal the completion of certain activities
Remarks on AOE
Determine the minimum amount of time required to complete a project
An assessment of the activities whose duration should be shortened to reduce the overall completion time
Evaluate performance
activity whose duration time should be shortened
minimum amount of time
Critical path
A path that has the longest length
Minimum time required to complete the project